yes
Court Royal Condos

Court Royal Condos in Charlotte, NC

Sika Applicator:
Mr. John Lambert Jr.
Stone Restoration of America
2601 Wikinson Blvd.
Charlotte, NC 28202

 

Sika products: Sikagard 550W and Sikasil WS 295.

yes
Twin Peaks Reservoir Restoration

Twin Peaks Reservoir in the City of San Franciaco was originally built in August 1910 -  nearly 105 years old. It was built as an auxiliary water supply system for fire protection. Over time the structure began to loose water and it was taken out of service. In December 2011, Sika products were recommended to get the structure back in service. The design took about 2 years and the work began in Fall 2014. Today the reservoir has been given new life and is now back in service, and most importantly, 100% leak free. Sika products: Sikaflex 2c, Sikadur Combiflex, and SikaRepair 223.

yes
Bayshore Boulevard Balustrade Restoration

Bayshore Boulevard in downtown Tampa has the distinct honor of being the longest continuous sidewalk in the world. Supporting this five mile long sidewalk is a concrete seawall built as a protection from the Tampa Bay water. On top of the seawall sits a 5 mile long ornate reinforced concrete balustrade (decorative railing) as a safety for the users of this long sidewalk.

yes
Point Arena Lighthouse Restoration

Point Arena Lighthouse, owned and operated by the small non-profit organization, The Point Arena Lighthouse Keepers, is located in Mendocino County along the Pacific Coast of California, northwest of San Francisco. The original lighthouse was erected in 1870 with brick and mortar type construction common to most construction of this era.

yes
The Jordan Commons Parking Structure

The Jordan Commons parking structures in Sandy, Utah, just south of Salt Lake City, were constructed in 1999. In just the third year of service, structural repairs typically at the corners of the structures were required to address cracked and spalled concrete. Restraint of slab shrinkage caused by slabs connected to concrete shear walls perpendicular to the direction of shrinkage appeared to be the problem.

 

 

Concrete Case Studies and References

Search results  74  in 1.175 s
           
No Download/Name Doctype Lang Format Size
1 Alcatraz Cellhouse Case Study Construction English pdf 0.10 MB
Alcatraz Cellhouse

Date: 05/13/2015
cs-cpd-alcatrazcellhouse-us.pdf
Download pdf

2 Andover Water Treatment Plant Case Study Construction English pdf 0.15 MB
Andover Water Treatment Plant

Date: 09/08/2014
cs-cpd-AndoverWaterTreatmentPlant-us.pdf
Download pdf

3 Bay Bridge - Northern California Case Study Construction English pdf 0.32 MB
Bay Bridge - Northern California

Date: 09/08/2014
cs-cpd-baybridge-us.pdf
Download pdf

4 Bayshore Boulevard Balustrade Case Study Construction English pdf 2.20 MB
Bayshore Boulevard Balustrade

Date: 09/09/2014
cs-cpd-Bayshore-Boulevard-Balustrade-Rehabilitationus.pdf
Download pdf

5 Bellaire Tower Case Study Construction English pdf 1.04 MB
Bellaire Tower

Date: 09/09/2014
cs-cpd-Bellaire-Tower-us.pdf
Download pdf

6 Biltmore Palm Beach Case Study Construction English pdf 0.79 MB
Biltmore Palm Beach

Date: 09/09/2014
cs-cpd-Biltmore-Palm-Beach-us.pdf
Download pdf

7 Braintree High School Case Study Construction English pdf 0.13 MB
Braintree High School

Date: 09/08/2014
cs-cpd-BraintreeHighSchool-us.pdf
Download pdf

8 Brigadoon Condominium Case Study Construction English pdf 0.16 MB
Brigadoon Condominium

Date: 09/08/2014
cs-cpd-brigadoon-us.pdf
Download pdf

9 Building 10 Emergency Rescue Case Study Construction English pdf 0.14 MB
Building 10 Emergency Rescue

Date: 09/08/2014
cs-cpd-Building10EmergencyRescue-us.pdf
Download pdf

10 Carlyle Floor Slab Leveling Case Study Construction English pdf 2.10 MB
Carlyle Floor Slab Leveling

Date: 09/09/2014
cs-cpd-Carlyle-Floor-Slab-Leveling-us.pdf
Download pdf

11 Carnegie Hall Case Study Construction English pdf 1.07 MB
Carnegie Hall

Date: 12/08/2014
Carnegie Hall - Roofing.pdf
Download pdf

12 Cathedral Hill Project Case Study Construction English pdf 0.15 MB
Cathedral Hill Project

Date: 09/08/2014
cs-cpd-CathedralHillProject-us.pdf
Download pdf

13 DFW Terminal Case Study Construction English pdf 1.87 MB
DFW Terminal

Date: 09/09/2014
cs-cpd-DFW-Terminal-us.pdf
Download pdf

14 Dry Fork Station, Gillette Case Study Construction English pdf 0.21 MB
Dry Fork Station, Gillette

Date: 11/25/2014
cs-cpd-DryForkStation-us.pdf
Download pdf

15 Evans Hall Case Study Construction English pdf 1.04 MB
Evans Hall

Date: 09/09/2014
cs-cpd-Evans-Hall-us.pdf
Download pdf

16 Floyd Hall Science Building Case Study Construction English pdf 0.15 MB
Floyd Hall Science Building

Date: 09/08/2014
cs-cpd-floydhall-us.pdf
Download pdf

17 Frederick Ferris Thompson Library Case Study Construction English pdf 0.32 MB
Frederick Ferris Thompson Library

Date: 09/08/2014
Frederick Ferris Thompson Library.pdf
Download pdf

18 Frenchmans Reef Case Study Construction English pdf 0.97 MB
Frenchmans Reef

Date: 09/09/2014
cs-cpd-Frenchman's-Reef-us.pdf
Download pdf

19 G&H Building, Pascagoula, MS Case Study Construction English pdf 0.60 MB
G&H Building, Pascagoula, MS

Date: 09/08/2014
cs-cpd-pascagoula-us.pdf
Download pdf

20 GE Building - Rockefeller Center, NY Case Study Construction English pdf 1.48 MB
GE Building - Rockefeller Center, NY

Date: 09/18/2013
GE Building.pdf
Download pdf