2013
Cleveland, Ohio
Record-breaking engineering on display in Cleveland's innerbelt. Recognized as a vital transportation route for downtown Cleveland, Ohio, the westbound George V. Voinovich Bridge was built using the exclusive Design-Build Process. This innovative bridge on the I-90/Innerbelt Freeway was conceived to replace the aging Innerbelt Bridge, built in 1959.
The Ohio Department of Transportation, with Watson Bowman Acme, worked with a Design/Build team to provide three custom Wabo®Modular expansion joints for the bridge. These large movement modular systems are key in creating a more sustainable bridge design, protecting and lengthening the expected lifespan of the structure. The massive joints, manufactured up to an astounding 110 feet in length, allow for movements up to 30 inches. Their design permits the bridge to accommodate constant heavy traffic loads while allowing the structure's natural movement to occur.
A testament to the engineering and manufacturing prowess of WBA, this project - at the time of its completion - holds the title of "longest ever modular joint system on a Design/Build structure."
George V. Voinovich Bridge
Vital artery to Downtown Cleveland
Scope:
WBA engineered the longest-ever custom Wabo®Modular expansion joints for this project: manufactured, shipped, and installed in one 110' piece.
Owner:
ODOT
Design Team:
HNTB Ohio
General Contractor:
Walsh Construction Group