PAREX® 121 Dry HI Basecoat & Adhesive
PAREX® 121 Dry HI Basecoat & Adhesive as a High Impact EIFS Basecoat & Adhesive. It can be used as an adhesive to laminate EPS to listed substrates, and as a basecoat with increased impact and puncture resistance. Formulated to support enhanced impact classification ratings.
- Impact and Puncture Resistance
- Dual use Basecoat & Adhesive
- Fire Tested Performance
- Proven Wall Technology
- Commercial or Residential
Usage
PAREX® 121 Dry HI Basecoat & Adhesive may be used as a leveler and filler for masonry, concrete, and stucco surfaces only. For this application only, PAREX® 121 Dry HI Basecoat & Adhesive can be built up to 1/4 in. (6mm) thick in a single pass.Advantages
- Impact and Puncture Resistance
- Dual use Basecoat & Adhesive
- Fire Tested Performance
- Proven Wall Technology
- Commercial or Residential
Packaging
50 lbs. (22.7 kgs) net weight bag
Product Details
APPROVALS / STANDARDS
Please refer to table below to acheive desired impact classification.
EIMA/ASTM CLASSIFICATION | PAREX MESH | PAREX SYSTEM | PAREX IMPACT CLASSIFICATION |
Standard | 355 Standard Mesh 4.5 oz |
|
|
Intermediate | SikaWall-9000 Intermediate 12 |
|
|
High | SikaWall-9000 Strong 15 |
|
|
Ultra High (over 150 in-lb) | SikaWall-9015 Ultra High 20 (Plus Standard Mesh 4.5oz) |
|
|
* Achieve Higher Impact Classification with lower material cost and labor
Shelf Life
12 months, when properly stored in original container.
Storage Conditions
- Protect materials during transportation to avoid physical damage. Store in a cool, dry place protected from freezing, extreme heat and direct sun. Store at no less than 40°F (4°C).
- Do not stack pallets.
Application
Substrates
- Exterior grade gypsum sheathing
- Glass mat gypsum sheathing
- Masonry, concrete and cement board
- EPS
- Parex WeatherSeal Spray & Roll-On and WeatherSeal Trowel-On Water Resistive Barrier Coatings
Drying Time
Full adhesive bond strength is reached after 1–4 days, depending on humidity and temperature. Dries within 24 hours under normal drying conditions [70ºF (21ºC), 50% RH]. Cold and/or humid weather may extend drying time. SikaWall Accel-Pak may be added to decrease drying time. See Data sheet for more information.
Coverage
Depending on the condition of the substrate and method of application, approximate coverages per bag are:
As an adhesive:
- 5/16 in. (8mm) notched trowel: 130-145 ft2 (12-13.5 m2)
- 5/8 in. (16mm) notched trowel: 80-95 ft2 (7.4-8.8 m2)
- 1/2 in. (12.7mm) notched trowel: 135-150 ft2 (12.5-14 m2)
As a basecoat to embed
- Parex 355 Standard Mesh: 105-125 ft2 (9.7-11.6 m2)
- SikaWall-9000 Intermediate 12 Mesh: 70-90 ft2 (6.5-8.3 m2)
As a double-layer basecoat to embed
- Parex 355 Standard Mesh and SikaWall-9005 Intermediate 6 Mesh: 35-55 ft2 (3.3-5.1 m2)
SURFACE PREPARATION
Planar irregularities are limited to 1/4 in. (6mm) or less in a 4 ft. (1.22 m) radius. Surface irregularities are limited to 1/4 in. (6mm) or less for masonry and concrete and 1/8 in. (3mm) or less for sheathing.
Irregular and uneven surface should be filled with any Parex 121 Basecoat & Adhesive.
Remove surface contaminants such as dust or dirt without damaging the substrate.
Painted substrates must have the paint removed with methods that result in no more than 10% of the remaining surface having paint.
For additional options for surface preparation, contact Sika Facades Technical Services Department.
MIXING
- Use clean equipment for mixing and preparation.
- Add 5-6 quarts (4.7-5.7 L) of cool clean potable water to a 5 gal pail.
- Add half of the amount of 121 Dry HI Basecoat & Adhesive and mix to a homogenous consistency using a heavy-duty 1/2 in. (13 mm) drill with a rust-free paddle at 400-500 rpm.
- Then add the remaining half and mix until consistent.
- Small amounts of cool clean potable water may be added to adjust workability.
- Let the mixture stand for five minutes after initial mixing, then stir again, adding small amounts of water for workability once only.
- Parex 121 Dry HI Basecoat & Adhesive should be used immediately after mixing.
- Half batches may be mixed for convenience.
- Only Sika Facades approved additives can be added to this product.
APPLICATION
Read the entire label before using this product.
- Adhesive Application: Apply the 121 Dry HI Basecoat & Adhesive to the entire surface on one face of the insulation board, using a 5/8 in. (16mm) notched trowel for masonry and concrete, or a 1/2-in. notched trowel for the WaterMaster System, or a 5/16 in. (8mm) notched trowel for sheathing. The adhesive ribbons should be of uniform thickness, run vertically when positioned on the wall (parallel to the 2 ft. [61 cm] board dimension), and reach the perimeter of the insulation board.
- To ensure high initial grab and uniform adhesive contact, apply insulation board to the wall with firm pressure to the entire surface.
- Apply sufficient pressure to flatten adhesive ridges. Glass mat sheathing requires extra pressure.
- Base coat Application: Rasp EPS board after 24 hours and when adhesive has fully cured and bonded.
- Using a stainless steel trowel, apply the 121 Dry HI Basecoat & Adhesive mixture to the rasped surface of the insulation board to a uniform thickness of 1/16 - 3/32 in. (1.5 - 2.4mm). Embed the Parex USA reinforcing mesh immediately in the wet 121 Dry HI Basecoat & Adhesive mixture. Smooth the surface of the 121 Dry HI Basecoat & Adhesive mixture with a trowel until the reinforcing mesh is fully embedded and the basecoat thickness is approximately 1/16 in. (1.5mm). The color of the reinforcing mesh should not be visible at the surface of the 121 Dry HI Basecoat & Adhesive material. A slight pattern of the mesh is acceptable, due to shrinkage of the cementitious Basecoat upon drying.
- As a leveler or filler: Apply Parex 121 Dry HI Basecoat & Adhesive and trowel to a smooth, uniform surface. Maximum thickness in a single application should be no more than 1/4 in. (6mm).
- When overlapping reinforcing mesh, special care must be taken to ensure the basecoat & mesh is flat, level and free from bumps. Basecoat should be feathered onto either side of the overlap.
- The mesh overlaps should be reviewed to ensure they are acceptably flat before proceeding.
- When SikaWall-9000 Intermediate 12 Mesh is used in a single layer, the SikaWall-9000 Intermediate 12 Mesh should be embedded into wet Parex 121 DRY HI Basecoat & Adhesive with edges and ends tightly abutted. Immediately following this procedure, SikaWall-9020 Detail Backwrap Mesh strips are centered over the butted ends and edges of the SikaWall-9000 Intermediate 12 Mesh reinforcing mesh. Embed the short detail mesh strips in base coat, troweling to a flat, flush surface covering the color of the detail mesh with base coat. Do not allow a build up of base coat thicker than on the surrounding SikaWall-9000 Intermediate 12 Mesh.
- Refer to Parex Technical Bulletin - Importance of Properly Backwrapping Drainage EIFS