06/22/2026
In preparation for hosting upcoming international World Cup Matches, a major renovation initiative was undertaken within the hospitality suites of a prominent retractable-roof stadium in Texas. With a demanding schedule and scope of work, the renovation team relied on innovative flooring solutions and efficient installation methods to deliver results within a compressed timeframe.
The project was driven by the need to modernize premium guest spaces, improve functionality, and ensure the facility would meet the high standards expected for one of the world’s most significant sporting events.
The renovation encompassed multiple hospitality suites located throughout the retractable-roof stadium, covering approximately 200,000 square feet of floor area. Existing finishes, including carpet and ceramic tile, were removed to make way for upgraded flooring systems. During demolition, contractors discovered that many sections of the concrete substrate had sustained significant damage over the years. Previous fixture installations had left numerous holes, depressions, and uneven areas throughout the slab, creating substantial challenges that needed to be addressed before new floor coverings could be installed..
Recognizing the complexity of the substrate conditions, project stakeholders engaged with a Schönox Regional Business Manager to conduct a comprehensive jobsite evaluation. Following a detailed assessment of the existing floor conditions, recommendations were made by Schönox regarding substrate preparation and moisture management to ensure long-term flooring performance. This collaborative approach helped establish an efficient installation strategy that would support the project’s aggressive schedule while delivering a high-quality finished surface.
As part of the preparation process, the concrete substrate was treated with Schönox VD Acrylic Primer. The primer played a critical role in creating the proper bond between the existing concrete and the self-leveling underlayment system. By promoting adhesion and enhancing substrate stability, the primer helped establish a reliable foundation for the subsequent flooring installation phases.
To restore damaged areas and create a smooth, level surface across the expansive project footprint, the installation team selected Schönox ZM, a moisture-resistant, cement-based self-leveling compound. This advanced self-leveling product was chosen for its ability to deliver exceptional flow characteristics, high performance, and durability while also helping to reduce airborne dust during installation. The moisture-resistant properties of the material provided an additional layer of protection, making it particularly well suited for a high-traffic commercial environment such as a major sports venue. Given the sheer scale of the renovation, efficiency was paramount. The project required the installation of approximately 3,000 bags of Schönox ZM.
The pump-assisted installation process enabled the team to install large volumes of the self-leveling compound quickly and accurately across multiple work areas simultaneously. The use of the pump significantly accelerated production time while helping maintain material consistency from one area to the next. Pumping technology eliminated many of the limitations associated with traditional mixing and placement methods, allowing installers to move efficiently throughout the stadium and keep pace with the demanding construction schedule. This streamlined approach was instrumental in achieving the project’s ambitious timeline. Despite the extensive substrate repairs required and the large volume of material installed, the entire flooring preparation phase was completed in just two weeks.
The rapid turnaround demonstrated the effectiveness of combining high-performance products with experienced installation crews and advanced pumping equipment. Maintaining this schedule was critical, as installation teams focusing on different areas of construction needed timely access to the renovated hospitality suites to complete finish work, furnishings, and event-ready preparations. Beyond meeting schedule requirements, the renovation delivered substantial performance benefits. The self-leveled surfaces provided an ideal substrate for the installation of new floor coverings, ensuring improved aesthetics, durability, and long-term functionality. The restored concrete surfaces also helped eliminate concerns related to uneven floors, damaged slab areas, and potential flooring failures that could have impacted the stadium’s premium hospitality experience.
As the stadium prepared to welcome athletes, officials, sponsors, and fans from around the world, the successful completion of the hospitality suite renovation represented an important milestone in the venue’s broader event readiness program. Through careful planning, expert consultation, and the use of innovative Schönox flooring technologies, the project team transformed aging and damaged substrates into high-quality surfaces capable of supporting the demands of a world-class sporting event.
The renovation stands as a strong example of how premium-grade subfloor preparation solutions can help facility owners and contractors overcome challenging substrate conditions while meeting aggressive construction schedules. By leveraging the performance advantages of Schönox ZM, Schönox VD, and the Schönox Pump Program, the project achieved both speed and quality, ensuring the stadium’s hospitality suites were ready to deliver an exceptional guest experience for the upcoming World Cup matches.