Sarnacol® OM Board Adhesive
Two-component foamable polyurethane adhesive
0.0 (0)
Sarnacol® OM Board Adhesive is a two-component foamable polyurethane adhesive that is applied in one step and sets up in minutes.
- Low odor
- Low VOC
- Rapid application with appropriate dispensing tools
- Chemical cure for fast set up and dry in times
Usage
Used to bond insulations and cover boards to approved substrates and/or to intermediate insulation boards. AREAS OF APPLICATION Approved Substrates- Concrete
- Light Weight Insulated Concrete
- Cementitious Wood Fiber
- Gypsum
- Steel
- Mineral Surface Asphalt
- Aged Smooth Asphalt
- Approved Sika Vapor Retarders
- Approved Sika Base Sheets
- Polyisocyanurate Insulations
- Polystyrene Insulations
- High Density Polyisocyanurate Roof Boards
- Gypsum Cover Boards
Advantages
- Low odor
- Low VOC
- Rapid application with appropriate dispensing tools
- Chemical cure for fast set up and dry in times
Packaging
- 1.5 L (0.4 gal) dual cartridge, 4 dual cartridges per case, 19 lbs (8.6 kg) per case, 40 cases per pallet
- 10 gal (37.8 L) box set: 5 gal (18.9 L) 53 lb (24 kg) of Part A and 5 gal (18.9 L) 45 lb (20.4 kg) of Part B, 16 box sets per pallet
- 30 gal (113.6 L) drum set: 15 gal (56.8 L) 160 lb (72.6 kg) of Part A and 15 gal (56.8 L) 128 lb (58.1 kg) of Part B, 8 drums (4 sets) per pallet
- 100 gal (378.6 L) drum set: 50 gal (189.3 L) 553 lb (251 kg) of Part A and 50 gal (189.3 L) 465 lb (211 kg) of Part B, 4 drums (2 sets) per pallet
Color
Pink
Product Details
APPROVALS / STANDARDS
- FM Global
- Underwriters Laboratories
- Miami-Dade County
- Florida Building Code
Chemical Base
Liquid
Shelf Life
Cartridges & Box Sets: 18 months if stored properly in original unopened, sealed and undamaged packaging.
Drum Sets: 18 months if stored properly in original unopened, sealed and undamaged packaging.
Storage Conditions
Cartridges & Box Sets: Store in a cool, dry location at temperatures between 55°F (12.8°C) and 85°F (29.4°C). Protect from freezing at all times. Keep containers closed. Contamination by moisture or basic compounds can cause dangerous pressure build-up in a closed container.
Drum Sets: Store in a well-ventilated, cool, dry location at temperatures between 45°F (7°C) and 95°F (35°C). Protect from freezing at all times. When not in use keep stored containers closed. For long term storage, partially empty containers should be filled with dry inert gas at atmospheric pressure to avoid reaction with moisture. Contamination by moisture or basic compounds can cause dangerous pressure build-up in a closed container.
Volatile organic compound (VOC) content
11 g/L (Part A + B Combined)
Application
Coverage
Application rates vary depending on surface roughness and absorption rate of the substrate. Typical coverage rates when used on:
- Concrete is up to 2.5 squares per gallon
- Lightweight Concrete is up to 1.7 squares per gallon
- Cementitious Wood Fiber is up to 1.2 squares per gallon
- Gypsum is up to 1.2 squares per gallon
- Mineral Surface Asphalt and other Approved Sika Vapor Retarders is up to 1.7 squares per gallon
- Aged Smooth Asphalt is up to 1.7 squares per gallon
- Polyisocyanurate and Polystyrene Insulation is up to 2.5 squares per gallon
Rates are based on an application pattern of ribbons 12" (30 cm) o.c. If using the 100 gallon drum set (50 gal part A, 50 gal part B), coverage rate is up to 2.0 squares per gallon maximum.
SUBSTRATE PREPARATION
All surfaces must be clean, dry, and free of dirt, grease, oil, or other contaminants or particulates. All concrete surfaces must be cured prior to applying Sarnacol® OM Board Adhesive.
APPLICATION
SpotShot Applicator – Cartridges:
Remove the plastic plugs from the cartridge mixing head. Attach a mixing tip to the threaded mixing head. Place the cartridge into the applicator. When starting a new cartridge, dispense some adhesive into a bucket or other suitable receptacle to achieve a proper mix.
Apply the Sarnacol® OM Board Adhesive directly to the substrate using a ribbon pattern. Space ¾ – 1" (19 – 25 mm) wide wet beads at a maximum of 12" (30 cm) o.c. to achieve proper coverage rate. Actual ribbon spacing will depend on the wind uplift rating required. Allow the adhesive to turn to a pink color (approximately 4 – 8 minutes) before placing the boards into the adhesive. Walk boards in, ballast if necessary to achieve proper contact with substrate. Adhesive open time varies depending on weather conditions.
PaceCart Installation – Box Sets:
Install Part A and Part B components following instructions on the packaging. Always insure that the Part A and Part B containers are always hooked to the same dispensing holders or hoses (i.e. do not reverse the dispenser holders and hoses between Part A and Part B). All valves on the dispensing unit must be completely opened so a 1:1 ratio is achieved when moving the adhesive through the disposable mix tip and onto the substrate in a semi-liquid state. When starting a new box set, dispense some adhesive into a bucket or other suitable receptacle to achieve a proper mix.
Apply the adhesive directly to the substrate using a ribbon pattern. Space ¾ – 1" (19 – 25 mm) wide wet beads at a maximum of 12" (30 cm) o.c. to achieve proper coverage rate. Actual ribbon spacing will depend on the wind uplift rating required.
Allow the adhesive to turn to a pink color (approximately 4 – 8 minutes) before placing the boards into the adhesive. Walk boards in, ballast if necessary to achieve proper contact with substrate. Adhesive open time varies depending on weather conditions.
High Pressure Spray Application – Drum Sets:
The Part B (resin) component must be mixed for at least one minute. The A and B components should be sprayed at a 1:1 ratio.
Sarnacol® OM Board Adhesive is dispensed in a spray that rises ⅛" (3.2 mm) to ¼" (6.4 mm) above the substrate. Place the boards into the adhesive shortly after it has reached its maximum rise while it is still wet and tacky and before it reaches its tack free state. Maximum rise typically occurs within 2 minutes of application. The tack free time is usually 3 to 5 minutes. Walk the boards into place and ballast.
A chemical cure takes place securing the board in approximately 4 to 8 minutes after application, depending on temperature and weather
conditions. The set up time is typically 10 to 12 minutes. The tack free time and set up time will decrease as temperature increases. Multiple layers of boards should use the staggered joint method of application.