Vapor Retarder SA 106
0.0 (0)
Vapor Retarder SA 106 is a 106 mil (2.7 mm) thick self-adhesive vapor retarder for use within Sarnafil® and Sikaplan® insulated roof systems. Vapor Retarder SA 106 can also serve as temporary roof protection. It can be left exposed for up to six (6) months.
- Robust vapor retarder with durable weathering surface that allows for exposure for up to six (6) months
- Self-adhering side laps to simplify installation
- Sanded surface accepts approved urethane adhesives for insulation or membrane attachment
Usage
- Vapor retarder within Sarnafil and Sikaplan insulated roofing systems
- Temporary roof protection
- Direct application to steel, concrete, gypsum decks, approved gypsum boards and plywood
Advantages
- Robust vapor retarder with durable weathering surface that allows for exposure for up to six (6) months
- Self-adhering side laps to simplify installation
- Sanded surface accepts approved urethane adhesives for insulation or membrane attachment
Packaging
39.4" (1 m) x 49.2 ft (15 m) roll, 103 lbs (46.5 kg) per roll
20 rolls per pallet
Product Details
APPROVALS / STANDARDS
- FM Global
- Underwriters Laboratories
- Meets ASTM D6164, Type I, Grade S
Chemical Base
Self-adhesive SBS polymer modified bitumen with a non-woven polyester mat reinforcement and fine mineral aggregate (sand) topside. The self-adhesive underside is covered by a protective release liner that is removed during application.
Shelf Life
N/A
Storage Conditions
Store rolls on end and maintain in an upright position to prevent damage. Store rolls in a clean dry location and cover as necessary to protect rolls from environmental damage such as extreme cold, heat, or moisture.
Effective Thickness
106 mil (2.7 mm)
Mass per Unit Area
63 lb/100ft2 (3098 g/m2)
Tensile Strength
Peak load @ 0°F (-18°C)
Machine Direction | Cross Machine Direction |
110 lbf/in (19.3 kN/m) | 85 lbf/in (14.9 kN/m) |
Peak load @ 73.4°F (23°C)
Machine Direction | Cross Machine Direction |
85 lbf/in (14.9 kN/m) | 65 lbf/in (11.4 kN/m) |
Elongation
Elongation at peak load @ 0°F (-18°C)
Machine Direction | Cross Machine Direction |
35 % | 40 % |
Elongation at peak load @ 73.4°F (23°C)
Machine Direction | Cross Machine Direction |
55 % | 60 % |
Ultimate elongation @ 73.4°F (23°C)
Machine Direction | Cross Machine Direction |
60 % | 65 % |
Tear Strength
Machine Direction | Cross Machine Direction |
125 lbf (556 N) | 85 lbf (378 N) |
Dimensional Stability
Machine Direction | Cross Machine Direction |
<0.5 % | <0.5 % |
Service Temperature
240°F (116°C) | (ASTM D-5147) |
Low Temperature Bend
-15°F (-26°C) | (ASTM D-5147) |
Permeability to Water Vapor
0.010 perm (0.543 ng/(Pa·s·m2)) | (ASTM E-96) |
Application
SUBSTRATE PREPARATION
All surfaces must be clean, smooth, sound, dry, and free of loose materials, debris or contaminants such as water, moisture, frost, ice, oil and grease that would interfere with proper adhesion and compromise the performance of the product.
In accordance with the ICRI Technical Guideline No. 310.2R-2013, newly poured concrete surfaces may be finished by forming, wood float, steel or power trowel, or broom finished to meet the equivalency of a CSP type surface between a rating of 2 – 5.
APPLICATION
Vapor Retarder Primer SB, Vapor Retarder Primer VC or Vapor Retarder Primer WB is required on all substrates except for steel. Concrete surfaces must be dry before installation. Shake or stir primer before applying. Primers can be rolled, brushed or sprayed. Let the primer dry completely. Begin the installation at the low point of the roof. Chalk a line on the deck to align the sheet. Unroll, position, and align Vapor Retarder SA 106 with the release liner covered selvage edge on the up-slope side. After the sheet is placed in its final position, loosely reroll half of the sheet toward the center of the roll.
Carefully score the release liner across the width of the roll with a straight blade utility knife. Roll Vapor Retarder SA 106 into its final position as the release liner is being removed. Re-roll the remaining Vapor Retarder SA 106 and repeat the process.
On steel decks install a 6" x 42" (15.2 cm x 1.1 m) metal plate under the end lap to support the membrane between the steel flutes. Stagger the end laps by at least 12" (30.5 cm). Roll Vapor Retarder SA 106 with a 75 lb (34 kg) steel roller to ensure full contact with the substrate.
Align successive sheets with 3" (7.6 cm) side laps and 6" (15.2 cm) end laps. The seam area has a pre-applied primer/adhesive on one side for mating with the bottom of the next sheet. Remove the release liner from the seam area and mate the top sheet to the bottom. Roll the seam area to ensure full contact. Hot air weld the end laps. Hot air welded laps must show a minimum ½" (1.3 cm) bleed out. Stagger adjacent end laps a minimum of 12" (30.5 cm). Apply Sika’s Mastic to seal around penetrations. Use a trowel to mound Sika’s Mastic around the penetrations to seal the opening. Do not apply Sika’s Mastic where it may come into direct contact with the Sarnafil® or Sikaplan® membrane.